Two quotations for the same fleet order rarely describe the same vehicles.
One supplier may quote a lead-acid configuration with a basic seat layout. Another may quote lithium batteries, a different body, and an upgraded controller.
The price difference may look large. Yet the real difference often comes from the specification.
The root cause is usually an incomplete RFQ. When the buyer leaves key decisions open, each supplier fills the gaps differently.
A good RFQ removes those gaps before suppliers start quoting.
Why Incomplete RFQs Produce Incomparable Quotes
Treat the RFQ as a structured checklist, not a casual message.
State the application, capacity, route, terrain, battery, charging conditions, options, and logistics requirements. Give each item its own field.
Suppliers can then answer the same questions line by line.
This approach lets buyers compare configurations instead of headline prices. It also keeps the buyer in control of the final specification.
Suppliers do not necessarily avoid details when they receive a vague request. An incomplete brief simply leaves important choices open.
Each supplier may use its own standard build to fill those gaps. As a result, the quotations may share only one clear field: price.
That makes a fair comparison difficult.

Fix the Application Before the Vehicle
Start the RFQ with the job the vehicle needs to perform.
A supplier can recommend a suitable configuration when the buyer explains the duty. A model number alone gives the supplier much less information.
Include these application details:
- What the vehicle does: State whether the vehicle carries passengers, tools, materials, or a mix of these duties.
- Where it operates: Identify private sites, pedestrian areas, approved road crossings, or other operating environments.
- Who operates it: State whether employees, shift teams, or temporary staff will use the vehicles.
- Operating hours: Give daily and weekly usage. Note whether one vehicle covers one shift or two.
- Destination market: State the country and market where the vehicles will operate. This helps define equipment and documentation needs.
This application section can prevent a common quote mismatch.
A supplier may recommend a platform that does not suit the actual duty when the RFQ never explains that duty.
If you already know which configuration families you want to consider, the golf cart range provides a useful starting point.
Capacity, Route and Terrain Inputs
The second RFQ section should define the physical requirements.
These details affect the body, drivetrain, seating layout, and overall vehicle configuration. Give suppliers measurable values whenever possible.
| Input | What to state | Why the supplier needs it |
|---|---|---|
| Passenger or payload capacity | Required seats and heaviest intended load | Helps determine body, seating layout, and load rating |
| Route length and duty cycle | Distance per shift and stops per route | Helps determine energy needs and battery sizing |
| Terrain and gradients | Surface types and steepest sustained slope | Helps determine motor and controller requirements |
| Access dimensions | Narrowest gate, doorway, or lane | Limits vehicle width, length, and turning geometry |
| Operating environment | Indoor, coastal, dusty, cold, or covered storage | Affects finish, sealing, and enclosure choices |
Do not leave unknown values blank.
Instead, tell the supplier that you need a recommendation. You can also measure the site before requesting final quotations.
A blank field creates room for supplier assumptions. Those assumptions can later become specification changes and extra costs.
The low speed vehicle manufacturers guide also explains why buyers should evaluate a supplier’s ability to work from a defined specification.
Battery, Charging and Duty Cycle Inputs
Battery specifications can create large differences between quotations.
Pack chemistry, capacity, charger specifications, and charging time all affect the final configuration. They can also change the total cost.
Give suppliers clear operating conditions. Then ask them to propose the appropriate battery configuration.
Alternatively, specify the exact battery system you require.
Include these inputs:
- Daily energy expectation: State the distance and duty the vehicle must cover between charges.
- Charging window: State when charging can occur and how long the vehicle can remain connected.
- Charging infrastructure: Give the available power supply, charging locations, and site arrangements.
- Temperature range: State the lowest and highest operating and charging temperatures.
- Battery handling: Explain whether operators charge the battery in the vehicle or remove the pack for charging.
The charging window can strongly affect the supplier’s recommendation.
For example, a short charging window may require a larger battery or a planned vehicle rotation. An unrestricted overnight charging schedule may support a different configuration.
If the RFQ does not state the charging window, suppliers may make different assumptions.

Options, Branding and Documentation
The final RFQ section should define the details that turn a base vehicle into the actual order.
Separate required equipment from preferred options.
This distinction helps suppliers price the order more accurately.
Include:
- Required equipment: Lights, mirrors, restraints, weather protection, and market-specific safety equipment.
- Branding: Colours, logos, finishes, and artwork requirements.
- Accessories: Cargo beds, tool storage, racks, seating layouts, and other attachments.
- Documentation: Required certificates, manuals, language versions, and technical documents.
- Spare parts: State whether the first order should include a spare-parts package and identify the required components.
Documentation often becomes an afterthought.
Buyers may discuss certificates and manuals only after receiving the quotation. That can create delays and unexpected costs.
Put documentation requirements into the original RFQ instead.
Once the request is complete, the supplier checklist can help you evaluate supplier responses.
The sample order article covers the next step when you order a pre-bulk sample or evaluation vehicle.
Planning Scenario: Two Quotations Compared After One RFQ Rewrite
An illustrative planning example, not a customer case
Consider an importer sourcing passenger and utility vehicles for a resort market.
The importer first sends a short email. The email includes the quantity and a target price.
Three suppliers respond with different configurations.
One offers a lead-acid passenger vehicle. Another offers a lithium utility vehicle. The third sends a mixed proposal without a clear seat count.
The importer cannot compare the three quotations fairly.
The importer then rewrites the RFQ as a structured input set.
The new RFQ covers:
- Application and destination market
- Seat and payload requirements
- Route distance per shift
- Surface types and steepest slope
- Access dimensions
- Charger window and available power supply
- Required equipment
- Documentation
- Branding artwork
- Spare-parts package
The importer sends the same RFQ to all three suppliers.
Two suppliers answer every field. The third marks two items as subject to confirmation.
The comparison becomes much clearer.
The importer can now compare the two complete quotations configuration by configuration. The remaining price difference has a clear reason.
The importer can also identify the third quotation’s missing information before making a purchasing decision.
The rewrite did not add new requirements.
It simply converted existing requirements into fields that suppliers could answer.
That change made the second quotation round comparable.
Keeping the RFQ Standard Without Adding Admin
A good RFQ template should save time after the first use.
Do not create a new sourcing format for every order. Build one standard template and reuse it.
Update only the fields that change between projects.
You can also review the template after each sourcing round. If one field repeatedly creates different supplier assumptions, make that field more specific.
The maintenance schedule article shows how structured information can support fleet planning.
The same principle applies during vehicle sourcing.
When you define requirements consistently, suppliers have fewer opportunities to make different assumptions.
If you are reconsidering the vehicle class, the golf cart range can help you identify suitable configuration families before you send the RFQ.

Frequently Asked Questions
What should a golf cart RFQ include?
Include the application, destination market, passenger or payload capacity, route distance, duty cycle, terrain, access dimensions, battery requirements, charging conditions, equipment, branding, documentation, and spare parts.
Give each requirement its own field.
Where you do not know the value, ask the supplier to propose one and clearly mark it as an assumption.
How many suppliers should receive the same RFQ?
Send the same RFQ to enough qualified suppliers to create a useful comparison.
The exact number depends on your project and sourcing strategy.
The important point is consistency. Give every supplier the same requirements and supporting information.
How do I compare quotations when suppliers propose different configurations?
Compare every quotation field by field.
Mark any difference from the original requirement. Then ask the suppliers to confirm the same specification.
This process separates genuine configuration differences from supplier assumptions.
Is a target price useful in an RFQ?
Yes, if you present it as a budget target.
Do not use the target price as a substitute for the vehicle specification.
A low target price may encourage suppliers to reduce equipment or choose a lower-cost configuration. Define the required specification first.
What happens to the RFQ after the order is placed?
Keep the final RFQ with the order file.
Use it to confirm the production configuration before manufacturing. It can also support later discussions about parts, warranty, and configuration changes.
Making the Input Set the Standard
A good RFQ makes every supplier answer the same questions.
That is the key to a fair comparison.
Build the template once. Keep every field either completed or clearly marked for supplier input.
Then reuse the same structure for future sourcing rounds.
The first version takes more effort. Future sourcing becomes faster.
The template can also reveal where suppliers often interpret requirements differently. You can improve those fields over time.
Keep the final RFQ with the order documentation. It becomes the reference for production, inspection, parts, and warranty discussions.
Treat every unanswered field as an open decision.
Either provide the missing requirement before sending the RFQ, or ask the supplier to propose a solution and mark it as an assumption.
Before placing the order, use the bulk order checklist to review the acceptance and order details.
If you are preparing a sourcing round, send LVTONG your application, capacity, route, charging requirements, destination market, and documentation needs.
This information provides a strong starting point for configuration discussions.
You can contact the LVTONG team through the enquiry form to start the discussion.







